EXPLORATION & PRODUCTION

Sumatra's premier hydrocarbon asset portfolio.

Sugih aspires to create wealth and value for shareholders through the exploration, development and production of Indonesia's vast energy resources, specifically oil and natural gas.

3

Active Blocks

511M

Bbls Oil Resources*

467

Bcf Gas Resources*

Sumatra

Operating Region

* Gross recoverable prospective resources — DeGolyer & MacNaughton (Lemang block)

LEMANG BLOCK

Lemang Block

Sumatra, Indonesia

PARTICIPATING INTEREST
PT Hexindo Gemilang Jaya51%*
Eastwin Global Investment Limited49%

*Operator

The Lemang block is located in Sumatra, Indonesia, a region with one of the highest technical success rates in the world for oil and gas exploration. The Lemang block is adjacent to the Jabung block, operated by PetroChina, an already producing block with daily output of approximately 53,000 barrels of oil equivalent per day ("boepd") (Jakarta Post, 2013).

Based on volumetric studies from international petroleum consultancy DeGolyer & MacNaughton, the Lemang block holds an estimated 511 million barrels of oil and 467 billion cubic feet of gas (gross recoverable prospective resources).

Sugih holds a 49% participating interest in the Lemang block (non-operator) through its subsidiary Eastwin Global Investment Ltd., a natural resource focused investment company with specific focus on the Indonesian market.

Since coming into Sugih's portfolio, the operator has made three discoveries at the Lemang block since beginning exploration in 2012:

Aggregate flow rates from the Selong-1, Akatara-1 and Akatara-2 wells stand at approximately 9,500 boepd. As a result of the successful exploration work program at the Lemang block, Sugih announced in February 2014 that the government mandated that the operator transition from its exploration program to the Plan of Development for commencement of commercial production.

Additionally, in April 2014, Sugih announced the results of an independent evaluation of the Lemang block by international petroleum advisory RISC Operations. The RISC evaluation estimates peak production from the Lemang block of 57,000 bopd and 101 mmscfd of natural gas (high-case scenario). Sugih is now working with the operator to develop the block for commercial production with first production targeted for late 2015 or 2016.

The production-sharing contract ("PSC") for the Lemang block remains valid until 2037.

OPERATIONAL HIGHLIGHTS
  • December 2012: Operator discovered 222 feet of gross pay in exploration drilling at the Selong-1 well, the first exploration well to be drilled at the block.

  • May 2013: Operator discovered 274 feet of gross pay at the Akatara-1 well, the second exploration well to be drilled at the block.

  • February 2014: Operator announced the third discovery at the block's Akatara-2 appraisal well; testing indicated flow rates of approximately 2,300 bopd and 5.4 mmscfd.

KALYANI BLOCK

Kalyani Block

Sumatra, Indonesia

PARTICIPATING INTEREST
Eurorich Group Limited85%*
PT Pertamina Hulu Energi Kalyani15%

*Operator

The Kalyani block is located in South Sumatra and Jambi provinces, Sumatra, Indonesia, one of the most favorable regions in Indonesia for oil and gas exploration. The current production sharing contract for the block was awarded on 19 December 2011. The Kalyani block comprises six areas totaling approximately 586 square kilometers.

Gas was encountered at the block in 1975 by the previous operator and participating interest holder of the block, Redco Indonesia Ltd. during exploration drilling of the Tempino-176 well, which reached the block's Talang Akar formation. Fractured gas reservoirs were encountered at depths of 2,535-2,590 meters and 2,660-2,735 meters respectively.

On 18 September 2012, Sugih acquired 51 percent share ownership of Eurorich Group Limited, giving the company participating interest rights and partial operating rights to the Kalyani block.

In August 2013, Sugih successfully completed a JOA with Indonesian energy producer PHE, a subsidiary of state-owned oil and gas company PT Pertamina (Persero) ("Pertamina"). The JOA resulted in Sugih farming out 15% of the Kalyani block, enabling the company to partner with an established national E&P company with a proven track record of successfully managing Indonesian assets.

The PSC for the Kalyani block remains valid until 2041.

Interested in a partnership?

Contact our investor relations team to discuss joint venture and partnership opportunities.

GET IN TOUCH